煤海筑基稳保供 绿电入链添动能——新疆煤制油气战略基地建设提速Building a Strong Foundation in the Coal Sector to Ensure Stable Supply, Adding Momentum with Green Power Integration — Accelerating the Construction of Xinjiang's Coal-to-Oil and Gas Strategic Base

近日,新疆维吾尔自治区人民政府新闻办公室举行“十五五”开局起步主题新闻发布会,明确提出推进准东、哈密国家煤制油气战略基地建设,提升油气战略保障能力,积极推进绿氢与煤化工耦合发展,着力实现煤炭清洁高效利用。驻晋央企中国化学工程二化建正把这一部署落到天山南北的项目现场。
在准东经济技术开发区五彩湾,新疆山能化工准东五彩湾80万吨/年煤制烯烃项目正推进建设。二化建承担该项目全厂水系统与火炬总承包工程,近期多个框架单体主体结构顺利封顶,膜车间水池、膜浓缩水池及1号、2号烯烃循环水站等建筑工程同步推进,塔林在戈壁滩上渐次立起。烯烃是合成树脂、合成纤维的源头原料,把煤转化为“工业粮食”,正是把资源优势转化为产业优势的关键一步。
在准东东部,新疆天池能源准东20亿立方米/年煤制天然气项目气化工程按节点推进。10月上旬,变换及热回收、煤气水分离、酚氨回收及管廊等单元的防火涂料工程专业分包相继成交,为后续设备安装蓄势。我国能源资源禀赋富煤、少油、缺气,煤制天然气是提升油气战略保障能力的重要路径;装置建成后,戈壁深处的清洁燃气将与“西气东输”输送网络有效衔接。
在天山北坡,二化建承建的新疆天合能化智能生态光伏耦合绿色特种树脂低碳转型升级示范工程(一期)已经开工。项目以煤气化为龙头,配套乙醇、聚氯乙烯、离子膜烧碱等装置,同步让光伏发电与化工生产相耦合,把绿电直接送进生产线,为装置运行添一份清朗底色。新疆明确持续加大煤化工产业链绿电绿氢替代力度,这一项目正是工程层面的响应。
三个项目指向同一条产业链的不同环节:煤制烯烃解决煤炭向化工材料的转化,煤制天然气解决煤炭向清洁燃气的转化,光伏耦合绿色树脂则解决转化过程中的电力来源与碳排放强度问题。将三者放在准东、哈密两个基地的布局中考量,可以看出新疆煤化工的取向并非单纯扩大产能规模,而是在保障油气战略安全的同时,把绿电、绿氢嵌入生产流程。
从工程组织看,二化建在准东同时承担水系统、火炬、气化装置配套及光伏耦合项目,施工内容跨越土建、安装与专业分包多个环节。全厂水系统与循环水站属于化工装置的公用工程部分,其建设进度直接制约主装置试车;火炬系统则关系装置开停车与事故工况下的安全泄放。这些配套工程的节点推进,是主装置按期建成的前提。
煤制油气战略基地的建设节奏,与管网、原料、水资源条件紧密相关。准东地区煤炭资源丰富、开采成本较低,但水资源相对紧张,全厂水系统与膜浓缩、中水回用等设施因此成为项目设计的重点;煤制天然气装置建成后与“西气东输”管网衔接,则使产品得以进入跨区域输送通道,把产地优势转化为市场供给。
从一片塔林的崛起,到一条气脉的延伸,再到一缕绿电的入链,中国化学工程二化建把服务国家能源资源安全保障的部署,落成天山南北项目现场的实景。面向“十五五”,这支扎根三晋的建设队伍将继续以工程之力夯基垒台,新疆煤制油气战略基地也将从规划文本逐步转为可计量的产能与产量。
Recently, the Information Office of the People's Government of Xinjiang Uygur Autonomous Region held a press conference themed on the start of the 15th Five-Year Plan, explicitly proposing to promote the construction of the Zhundong and Hami national coal-to-oil and gas strategic bases, enhance the strategic security capability of oil and gas, actively advance the coupled development of green hydrogen and coal chemical industry, and focus on realizing the clean and efficient utilization of coal. China Chemical Engineering Second Construction, a central enterprise stationed in Shanxi, is implementing this deployment at project sites across the north and south of the Tianshan Mountains.
At Wucaiwan in the Zhundong Economic and Technological Development Zone, the Xinjiang Shanneng Chemical Zhundong Wucaiwan 800,000-ton/year coal-to-olefins project is under construction. Second Construction is responsible for the overall plant water system and torch general contracting engineering. Recently, the main structures of multiple framework units have been successfully topped out, and construction of buildings such as the membrane workshop water tank, membrane concentrate water tank, and Olefin Circulating Water Stations No. 1 and No. 2 is progressing simultaneously, with towers gradually rising on the Gobi Desert. Olefins are the primary raw materials for synthetic resins and synthetic fibers. Converting coal into 'industrial grain' is a key step in turning resource advantages into industrial advantages.
In the eastern part of Zhungeer, the gasification project of the Xinjiang Tianchi Energy Zhungeer 2 billion cubic meters per year coal-to-natural-gas project is progressing according to schedule. In early October, specialized subcontracting for fireproof coatings of units such as conversion and heat recovery, coal gas moisture separation, phenol-ammonia recovery, and pipe gallery was successively completed, laying the groundwork for subsequent equipment installation. China is rich in coal but has limited oil and gas resources, and coal-to-natural gas is an important path to enhance the strategic security of oil and gas; once completed, the clean gas from the depths of the Gobi Desert will effectively connect with the 'West-to-East Gas Transmission' network.
On the northern slope of the Tianshan Mountains, the Xinjiang Tianhe Energy Chemical Intelligent Ecological Photovoltaic-Coupled Green Special Resin Low-Carbon Transformation and Upgrade Demonstration Project (Phase I), undertaken by Erhuajian, has already started construction. The project is led by coal gasification, supporting units such as ethanol, polyvinyl chloride, and ion-membrane caustic soda, while simultaneously coupling photovoltaic power generation with chemical production, sending green electricity directly into the production line, adding a clear energy source to the operation of the units. Xinjiang has made it clear that it will continue to increase the replacement of green electricity and green hydrogen across the coal chemical industry chain, and this project is an engineering-level response to that initiative.
The three projects target different links of the same industrial chain: coal-to-olefins addresses the conversion of coal into chemical materials, coal-to-natural gas addresses the conversion of coal into clean fuel gas, and photovoltaic-coupled green resin addresses the power supply and carbon emission intensity issues during the conversion process. Considering the layout of these three projects across the Zhundong and Hami bases, it can be seen that Xinjiang's coal chemical industry is not simply aimed at expanding production capacity, but, while ensuring strategic oil and gas security, incorporates green electricity and green hydrogen into the production process.
From an engineering organization perspective, Erzhua Construction simultaneously undertakes the water system, flare, gasification unit supporting works, and photovoltaic-coupled projects in Zhundong, with construction tasks spanning civil engineering, installation, and specialized subcontracting. The plant-wide water system and circulating water station are part of the chemical unit's utilities, and their construction progress directly restricts the commissioning of the main units; the flare system is related to the start-up and shutdown of the units and safe relief under accident conditions. The advancement of these supporting project milestones is the prerequisite for the on-time completion of the main units.
The construction pace of coal-to-oil and gas strategic bases is closely related to the conditions of pipelines, raw materials, and water resources. The Zhundong area is rich in coal resources with relatively low mining costs, but water resources are comparatively scarce. Therefore, the plant-wide water system, along with facilities for membrane concentration and reclaimed water reuse, has become a key focus in project design. Once the coal-to-natural-gas facility is completed and connected to the 'West-East Gas Pipeline' network, the products can enter cross-regional transportation channels, transforming the advantage of the production location into market supply.
From the rise of a cluster of towers, to the extension of a gas pipeline, and then to the integration of a strand of green electricity into the chain, China Chemical Engineering Second Construction Company has implemented the national energy and resource security deployment on the field sites north and south of the Tianshan Mountains. Looking ahead to the 15th Five-Year Plan, this construction team rooted in Shanxi will continue to lay a solid foundation through engineering efforts, and the Xinjiang coal-to-oil and gas strategic base will gradually transition from planning documents to measurable production capacity and output.
[Source: Lu Net]
[Editor: Xiaoneng]
本网站摘录或转载的属于第三方的信息,目的在于传递更多信息,内容仅供参考。相关股票、投融资等资讯及分析并不代表本网站赞同其意见和对其真实性负责,不构成投资建议。
若不慎涉及侵权,请在相关内容刊发之日起 30 日内联系我们,我们将第一时间进行删除处理。
转载本网资讯请注明来源作者。本网原创文章、研究报告禁止转发。
Information excerpted or reprinted from third parties on this website is intended to convey more information for reference only. Related stocks, investment and financing news and analysis do not represent the endorsement of this website, nor does this website assume responsibility for their authenticity, and do not constitute investment advice.
If any content unintentionally infringes upon rights, please contact us within 30 days from the date of publication, and we will remove it as soon as possible.
When reprinting content from this website, please indicate the source and author. Original articles and research reports of this website may not be redistributed.
提交留言Submit message留下联系方式,平台将把您的需求推送给匹配的产业方Leave your contact details and we will match you with relevant industry partners.
数据来源与口径说明:本平台数据与资讯均以「唯一官方口径」采集与发布,优先采用国家部委、国家统计局、海关总署、中国氢能联盟、IEA / IRENA / IMO 等官方或政府间机构公开数据;同一指标只取一个来源,不做多源拼接。数值为公开发布值,可能因统计口径、产地与发布时间不同而存在差异,仅供参考,不构成交易依据。Data sources and methodology: all data and news on this platform are collected and published from a single official source, giving priority to public data from government bodies and intergovernmental organisations such as the National Bureau of Statistics, the General Administration of Customs, the China Hydrogen Alliance, and IEA / IRENA / IMO. One indicator has one source only and is never stitched together from multiple sources. Figures are published values and may vary with statistical scope, origin and release date. For reference only; not a basis for transactions.
相关信息Related Information同栏目 · 可直接进入各自最终页Same section · each opens its own final page
- 航天炉"点煤成金":从我国第一台自主粉煤加压气化炉到零碳负碳技术转型2026-10-12
- 18至25元对15元:绿氢成本逼近灰氢那一刻,8%至10%的项目收益是靠什么撑起来的2026-10-11
- 视频|海水制氢,中国突破!2026-10-11
- 陕西研制液氢航空地面保障系统完成全流程一体化测试2026-10-11
- 1121.05兆瓦与1062MW:2026上半年电解槽订单两个口径的差,与份额集中到46%的真相2026-10-11
- 从“气”到“氢”的一字之变 四川资阳打造成渝氢走廊氢源配送中心2026-10-10