绿氢规模化发展五大瓶颈与五招破局Five Major Bottlenecks and Five Strategies for Breaking Through the Large-Scale Development of Green Hydrogen

中国能源新闻网近日刊发对外经济贸易大学于子慧的署名文章《破解绿氢规模化发展瓶颈 确保实现“十五五”新能源非电利用规模倍增目标》。文章指出,“十五五”时期是绿氢产业从示范走向规模化的关键窗口期,近期《新型能源体系建设“十五五”规划》《可再生能源发展“十五五”规划》等顶层文件密集出台,明确了氢能及绿色燃料的战略定位和可再生能源制氢规模目标,但从产业实际看,制约绿氢规模化发展的瓶颈仍较为突出,亟须系统破解。
从发展现状看,“十四五”期间我国氢能产业逐步实现有序破局。根据《中国氢能发展报告(2026)》,截至2025年末,全国可再生能源制氢建成投运产能突破25万吨/年,占全球总产能半数以上,在建超90万吨/年;已建成绿氨、绿甲醇产能分别为70万吨/年和38万吨/年,一批标杆项目相继建成投运,实现了氢能生产—储运—应用产业流程的逐步贯通。从区域布局看,东北、华北、西北地区已投运产能合计占全国98%,绿氢生产的空间集聚效应初步显现。全国建成投运纯氢管道长度超350千米,累计建成加氢站超590座,上海、天津、大连等6个港口具备绿氨或绿甲醇加注能力,燃料电池汽车保有量约3.2万辆。总体看,“十四五”期间我国绿氢产业在供给能力、基础设施、应用规模等方面均取得显著进展,为“十五五”规模化发展奠定了坚实基础。
文章认为,进入“十五五”,绿氢产业在政策引导和市场需求的双重驱动下,正从试点探索迈向规模化发展新阶段。《新型能源体系建设“十五五”规划》明确将氢能和绿色燃料纳入非化石能源供给体系,提出新能源非电利用规模实现倍增,要求统筹氢能制储输用全链条发展,因地制宜发展绿电直连制氢、可再生能源离网制氢等模式。《可再生能源发展“十五五”规划》明确以电为核心、非电为突破的发展思路,提出到2030年可再生能源非电利用总规模较2025年增长1.5倍,折合约1.5亿吨标准煤,其中可再生能源制氢规模达到200万吨;在东北地区规划建设以外送为主的绿色氢氨醇生产基地,在黄河“几字弯”、华北北部、天山北麓等地区规划建设以就近利用为主的绿色氢氨醇生产基地。上述规划的密集出台,标志着绿氢已从局部示范正式上升为能源转型的战略性支撑力量。
文章分析了绿氢规模化发展面临的结构性矛盾。首先是工业领域消纳引导不足。据《中国氢能发展报告(2026)》,我国2025年合成氨、合成甲醇、炼化和煤化工四个领域合计消费氢气3310万吨,占全国氢气消费总量约85%,工业领域减碳难、氢气消费量大且需求稳定,是绿氢规模化消纳的现实主战场。2024年12月,《加快工业领域清洁低碳氢应用实施方案》提出到2027年清洁低碳氢在冶金、合成氨、合成甲醇、炼化等行业实现规模化应用,但未设定量化的绿氢替代比例目标;2026年3月,工信部等三部门印发《关于开展氢能综合应用试点工作的通知》,将支持范围从燃料电池汽车拓展至绿色氨醇、氢基化工原料替代、氢冶金、掺氢燃烧等综合应用场景,但在具体遴选中工业场景的权重和奖励标准还不明确。
其次是成本、储运与规模之间存在循环困境。以新疆等风光资源优质地区为例,依托低成本绿电优势,绿氢完全生产成本已降至约18元/千克,接近化石能源制氢成本,但距离10—12元/千克的规模化竞争门槛仍有明显差距。据中关村氢能联盟数据,2025年国内电解槽订单规模超5吉瓦,但电解槽产能利用率不足10%,大量已建成设备闲置。绿氢项目虽已纳入《绿色金融支持项目目录(2025年版)》和国家核证自愿减排量(CCER)机制,但碳资产收益的规模和稳定性仍有待验证。我国“三北”地区绿氢潜力巨大,而消费市场集中在华东、华南等经济发达区域,空间上的供需错配推高了输运成本。尽管《石油天然气发展“十五五”规划》提出油气与氢氨醇储运体系相融合,将氢氨醇纳入国家油气“全国一张网”的规划介质,但绿氢从生产端到消纳端之间,仍有很多基础工作有待完善。
第三是国内外市场未形成互补。受欧洲买家为满足碳合规要求而支付的绿色溢价吸引,目前国内规划建设的绿色氢氨醇项目大部分以出口为市场定位。但欧盟曾设定到2030年绿氢实现1000万吨本土产量和1000万吨进口的目标,落地进程远不及预期。2024年有23个欧洲绿氢项目停滞或取消;2025年欧盟氢能银行第二轮拍卖中15个入选项目有7个退出,退出容量占拍卖总量的75%以上。文章认为,欧洲项目大规模撤资说明海外绿氢市场自身的需求基础并不稳固,仅靠补贴难以持续支撑大规模商业化;当国内绿色燃料产能扩张到千万吨级时,全球绿色燃料供需格局将发生根本性变化,出口价格将面临较大压力,绿氢产业的稳定健康发展需要国内与国外两个市场同步规划。
第四是产业链主体错位。我国在新能源发电领域和化工领域均位居全球前列,两大产业的优势本应在绿色燃料产业链上形成协同效应。从已投产和在建项目投资主体分布看,新能源企业占据主导地位,但普遍不熟悉化工生产的连续运行和工艺控制,化工企业则缺乏新能源和电力项目开发经验,这种格局使得两大领域的优势难以形成合力。第五是绿电与绿氢之间协同不足。据全国新能源消纳监测预警中心数据,2025年甘肃、青海、新疆、西藏四地光伏发电利用率低于90%,其中西藏以64.9%居于末位。绿电直连政策虽已出台,但针对绿电制氢的并网型项目电网接入方案和计费方式等关键细则尚未明确,离网制氢、弱并网制氢等新模式尚在探索阶段。
针对上述瓶颈,文章提出破解绿氢规模化发展瓶颈应坚持政府引导与市场机制相结合。政府重在做好产业规划布局、标准制定和制度供给,引导产业链协同和区域布局优化;同时从起步阶段就构建市场化成本疏导和竞争机制,避免过度依赖补贴、形成长期财政负担,确保绿氢产业在政府引导下加快成长、在市场机制下可持续发展。
在具体对策方面,一是突出工业领域消纳优先地位,建立刚性需求拉动机制。在氢能综合应用试点推进中进一步明确工业场景的权重,借鉴可再生能源电力消纳责任权重制度,对合成氨、合成甲醇、炼化等行业研究设定2028年和2030年两档绿氢替代比例目标,探索通过绿氢绿证交易和碳配额约束形成刚性需求拉动,将绿氢消费纳入企业碳排放核算体系,明确绿氢使用产生的碳减排量可纳入碳排放履约抵扣,并研究制定全国统一的绿氢及衍生产品碳足迹核算标准。
二是打通储运瓶颈,加快构建氢氨醇储运基础设施体系。研究出台氢氨醇储运基础设施专项建设方案,同步开展低负荷成品油管道输送甲醇的工程示范,研究制定天然气掺氢输送和燃烧利用的技术标准与安全规范;近期优先推动“三北”地区风光制氢基地至周边化工园区短距离、点对点管道建设,形成可复制的投融资和运营模式,同时加快推进乌兰察布—京津冀等纯氢干线管道建设,在用地预审、环评、核准等环节给予绿色通道。
三是海外市场与国内市场同步规划,构建内外互补的消纳格局。明确将绿色氢氨醇国内消纳量纳入省级非电消费考核指标体系,研究制定统一的核算方法和数据报送机制;一方面支持企业参与国际市场竞争,另一方面研究建立国内绿色燃料消纳年度配额制度,优先保障化工、发电等行业需求,先期在合成氨、炼化等行业开展配额试点,区分出口型项目和内需型项目,实施分类管理。
四是建立电力—化工联合体机制,打通产业链协同梗阻。在氢能综合应用试点项目实施中,将联合体形式申报作为加分项;在项目规划核准环节,依托“沙戈荒”、水风光大基地,发挥中央企业产业链链长作用,优先支持由电力企业与化工企业联合申报的风光制氢氨醇一体化项目,联合体应明确股权合作协议、技术分工方案和产品消纳协议,并支持2—3个项目开展联合体试点,探索形成可复制的风险共担、收益分享模式。
五是细化电氢协同制度,打通绿电直连落地梗阻。加快出台绿电直连制氢项目电网接入技术规定,明确离网制氢、弱并网制氢、并网制氢三种模式的接入条件和运行规则,研究明确离网项目免收系统备用费的适用条件和认定程序;完善可再生能源电力消纳责任权重考核办法,明确将绿氢项目消纳的新能源电量计入省级能源主管部门的消纳责任权重完成指标,并在存在弃风弃光问题的西北地区加大绿氢与新能源协同开发力度,在内蒙古、甘肃、新疆等地率先建成3—5个离网制氢示范项目。
China Energy News recently published an article authored by Yu Zihui from the University of International Business and Economics titled 'Breaking the Bottleneck of Large-Scale Green Hydrogen Development to Ensure the Doubling of Non-Electric New Energy Utilization During the 15th Five-Year Plan.' The article points out that the 15th Five-Year Plan period is a critical window for the green hydrogen industry to move from demonstration to large-scale development. Recently, top-level documents such as the '15th Five-Year Plan for the Construction of a New Energy System' and the '15th Five-Year Plan for Renewable Energy Development' have been intensively issued, clarifying the strategic positioning of hydrogen and green fuels as well as the scale targets for renewable energy-based hydrogen production. However, from the perspective of industry practice, the bottlenecks restricting the large-scale development of green hydrogen remain prominent and urgently need systematic solutions.
From the perspective of development status, during the 14th Five-Year Plan period, China's hydrogen industry has gradually achieved an orderly breakthrough. According to the "China Hydrogen Development Report (2026)", by the end of 2025, the country's installed and operational capacity for renewable energy hydrogen production exceeded 250,000 tons per year, accounting for more than half of the global total capacity, with over 900,000 tons per year under construction; the installed capacities of green ammonia and green methanol reached 700,000 tons per year and 380,000 tons per year respectively. A number of benchmark projects have been completed and put into operation, gradually achieving a seamless hydrogen production–storage–transportation–application industrial chain. From the perspective of regional distribution, the operational capacities in Northeast, North China, and Northwest regions account for 98% of the national total, and the spatial agglomeration effect of green hydrogen production has initially emerged. Nationwide, more than 350 kilometers of pure hydrogen pipelines have been completed and put into operation, over 590 hydrogen refueling stations have been built, and six ports including Shanghai, Tianjin, and Dalian have the capacity to refuel green ammonia or green methanol. The number of fuel cell vehicles is approximately 32,000. Overall, during the 14th Five-Year Plan, China's green hydrogen industry has achieved significant progress in supply capacity, infrastructure, and application scale, laying a solid foundation for large-scale development in the 15th Five-Year Plan.
The article notes that entering the 15th Five-Year Plan period, the green hydrogen industry, driven by both policy guidance and market demand, is moving from pilot exploration to a new stage of large-scale development. The "15th Five-Year Plan for the Construction of a New Energy System" clearly incorporates hydrogen energy and green fuels into the non-fossil energy supply system, proposes a doubling in the scale of non-electric utilization of renewable energy, and calls for coordinated development of the entire chain of hydrogen production, storage, transportation, and utilization. It emphasizes developing models such as green electricity direct hydrogen production and off-grid renewable energy hydrogen production according to local conditions. The "15th Five-Year Plan for Renewable Energy Development" clearly promotes a development approach centered on electricity with breakthroughs in non-electric utilization and proposes that by 2030 the total scale of non-electric utilization of renewable energy will increase by 1.5 times compared to 2025, equivalent to about 150 million tons of standard coal, with renewable energy hydrogen production reaching 2 million tons. In the Northeast region, green hydrogen, ammonia, and methanol production bases focused on export are planned, while in the "S-shaped bend" of the Yellow River, northern Hebei, and the northern foot of the Tianshan Mountains, bases focused on local utilization are planned.
The intensive introduction of the above plans marks that green hydrogen has officially risen from local demonstrations to a strategic supporting force for the energy transition.
The article analyzes the structural contradictions faced by the large-scale development of green hydrogen. The first is the insufficient guidance for consumption in the industrial sector. According to the "China Hydrogen Energy Development Report (2026)", by 2025, the four fields of synthetic ammonia, synthetic methanol, refining, and coal chemical industry are expected to consume a total of 33.1 million tons of hydrogen, accounting for about 85% of the national hydrogen consumption. The industrial sector faces difficulty in carbon reduction, has a large hydrogen consumption, and a stable demand, making it the main practical battlefield for the large-scale utilization of green hydrogen. In December 2024, the "Implementation Plan for Accelerating the Application of Clean and Low-Carbon Hydrogen in the Industrial Sector" proposed the large-scale application of clean and low-carbon hydrogen in industries such as metallurgy, synthetic ammonia, synthetic methanol, and refining by 2027, but did not set quantitative targets for the replacement proportion of green hydrogen; in March 2026, the Ministry of Industry and Information Technology and two other departments issued the "Notice on Carrying Out Comprehensive Hydrogen Energy Application Pilot Work", expanding the scope of support from fuel cell vehicles to comprehensive application scenarios such as green ammonia and methanol, hydrogen-based chemical raw material replacement, hydrogen metallurgy, and hydrogen-blended combustion, but the weight and reward standards for industrial scenarios in specific selection processes are still unclear.
Secondly, there is a vicious cycle between cost, storage and transportation, and scale. Taking Xinjiang and other regions with superior wind and solar resources as an example, relying on the advantage of low-cost green electricity, the full production cost of green hydrogen has dropped to about 18 yuan/kg, approaching the cost of fossil fuel-based hydrogen, but there is still a significant gap from the 10–12 yuan/kg threshold for large-scale competitiveness. According to data from the Zhongguancun Hydrogen Energy Alliance, domestic electrolyzer orders will exceed 5 GW by 2025, but the utilization rate of electrolyzer capacity is less than 10%, with a large number of already built devices idle. Although green hydrogen projects have been included in the "Green Finance Supported Project Catalogue (2025 Edition)" and the national certified voluntary emission reduction (CCER) mechanism, the scale and stability of carbon asset returns still need to be verified. China’s "Three North" regions have huge green hydrogen potential, while the consumer market is concentrated in economically developed areas such as East China and South China, and the spatial mismatch between supply and demand has driven up transportation costs.
Although the "15th Five-Year Plan for Petroleum and Natural Gas Development" proposes integrating the oil and gas storage and transportation system with hydrogen, ammonia, and methanol, and includes hydrogen, ammonia, and methanol in the national oil and gas "one network across the country" planning medium, there is still much foundational work to be improved between the production and consumption ends of green hydrogen.
Third, domestic and international markets have not formed complementarity. Attracted by the green premium that European buyers pay to meet carbon compliance requirements, most of the green hydrogen, ammonia, and methanol projects currently planned and under construction domestically are aimed at the export market. However, the EU had set a target of achieving 10 million tons of domestic green hydrogen production and 10 million tons of imports by 2030, but progress has fallen far short of expectations. In 2024, 23 European green hydrogen projects were stalled or canceled; in the second round of EU Hydrogen Bank auctions in 2025, 7 out of 15 selected projects withdrew, with the withdrawn capacity accounting for more than 75% of the total auction volume. The article suggests that the large-scale withdrawal of European projects indicates that the demand foundation of the overseas green hydrogen market is not solid, and relying solely on subsidies cannot sustainably support large-scale commercialization. When domestic green fuel production capacity expands to the scale of tens of millions of tons, the global supply-demand pattern of green fuels will undergo fundamental changes, export prices will face considerable pressure, and the stable and healthy development of the green hydrogen industry requires simultaneous planning of both domestic and international markets.
Fourth is the misalignment of industry chain participants. China ranks among the world's leading countries in both renewable energy power generation and the chemical industry. The advantages of these two industries should ideally create a synergistic effect in the green fuel industry chain. From the distribution of investment entities in commissioned and under-construction projects, renewable energy companies dominate, but they generally lack familiarity with the continuous operation and process control of chemical production, while chemical companies lack experience in developing renewable energy and power projects. This pattern makes it difficult for the advantages of the two fields to form synergy. Fifth is the insufficient coordination between green electricity and green hydrogen. According to the National New Energy Consumption Monitoring and Early Warning Center, in 2025, the utilization rates of photovoltaic power generation in Gansu, Qinghai, Xinjiang, and Tibet are expected to be below 90%, with Tibet ranking last at 64.9%. Although direct connection policies for green electricity have been issued, key details for grid-connected green hydrogen projects, such as the grid access plan and billing methods, have not yet been clarified, and new models such as off-grid hydrogen production and weakly grid-connected hydrogen production are still in the exploratory stage.
To address the aforementioned bottlenecks, the article proposes that overcoming the bottlenecks in the large-scale development of green hydrogen should adhere to a combination of government guidance and market mechanisms. The government should focus on industrial planning and layout, standard formulation, and institutional provision, guiding industrial chain collaboration and regional layout optimization; at the same time, a market-oriented cost diversion and competition mechanism should be established from the initial stage to avoid excessive reliance on subsidies and the formation of long-term fiscal burdens, ensuring that the green hydrogen industry accelerates its growth under government guidance and achieves sustainable development under market mechanisms.
In terms of specific measures, first, emphasize the priority role of the industrial sector in consumption and establish a rigid demand-pulling mechanism. In advancing hydrogen energy comprehensive application pilot projects, further clarify the weighting of industrial scenarios, drawing on the renewable energy power consumption responsibility weighting system, and study setting two targets for green hydrogen replacement ratios in 2028 and 2030 for industries such as synthetic ammonia, synthetic methanol, and refining. Explore forming a rigid demand pull through green hydrogen certificate trading and carbon quota constraints, incorporate green hydrogen consumption into corporate carbon emission accounting systems, clarify that the carbon reduction from using green hydrogen can be included in carbon emission compliance deductions, and study the formulation of nationwide unified standards for calculating the carbon footprint of green hydrogen and its derivative products.
Second, address storage and transportation bottlenecks, and accelerate the construction of a hydrogen, ammonia, and methanol storage and transportation infrastructure system. Study and introduce special construction plans for hydrogen, ammonia, and methanol storage and transportation infrastructure, simultaneously carry out engineering demonstrations of transporting methanol through low-load refined oil pipelines, and study and formulate technical standards and safety regulations for hydrogen blending in natural gas transportation and combustion utilization. In the short term, prioritize the promotion of short-distance, point-to-point pipeline construction from wind and solar hydrogen production bases in the 'Three North' regions to surrounding chemical parks, forming replicable investment, financing, and operation models. At the same time, accelerate the advancement of pure hydrogen trunk pipelines such as the Ulanqab–Beijing-Tianjin-Hebei line, providing a green channel in steps like land pre-approval, environmental assessment, and project approval.
Third, the overseas and domestic markets should be planned synchronously to create a consumption pattern that complements both internal and external demands. It is necessary to clearly include the domestic consumption of green hydrogen, ammonia, and methanol into the provincial non-electricity consumption assessment indicator system, and study and formulate a unified accounting method and data reporting mechanism; on one hand, support enterprises in participating in international market competition, and on the other hand, study the establishment of an annual domestic green fuel consumption quota system, giving priority to the needs of industries such as chemicals and power generation. Initially, quota pilots should be carried out in industries such as ammonia synthesis and refining, distinguishing between export-oriented projects and domestic demand projects, and implementing classified management.
Fourth, establish a power–chemical consortium mechanism to unblock collaboration bottlenecks in the industrial chain. In the implementation of comprehensive hydrogen energy application pilot projects, giving bonus points for applications submitted in the form of a consortium; in the project planning and approval stage, relying on the 'Shage Desert' and large water, wind, and solar bases, leveraging the role of central enterprises as industrial chain leaders, priority is given to supporting integrated wind-solar hydrogen-ammonia-methanol projects jointly applied by power and chemical enterprises. The consortium should clarify equity cooperation agreements, technical division of labor plans, and product consumption agreements, and support 2–3 projects to carry out consortium pilots, exploring replicable models of shared risk and benefit sharing.
Fifth, refine the coordinated electricity-hydrogen system and remove obstacles to direct green electricity connections. Accelerate the issuance of technical regulations for grid access of green electricity direct hydrogen production projects, clarify the access conditions and operating rules for three modes: off-grid hydrogen production, weak grid-connected hydrogen production, and grid-connected hydrogen production, and study and clarify the applicable conditions and recognition procedures for exempting off-grid projects from system standby fees; improve the assessment method for the responsibility weight of renewable energy power consumption, clearly include the consumption of renewable energy power by green hydrogen projects in the completion indicators of the responsibility weight of provincial energy authorities, and, in the northwest regions where wind and solar curtailment exists, increase efforts for the coordinated development of green hydrogen and renewable energy, and take the lead in building 3–5 off-grid hydrogen production demonstration projects in Inner Mongolia, Gansu, Xinjiang, and other areas.
[Source: China Energy News]
[Editor: Xiao Neng]
本网站摘录或转载的属于第三方的信息,目的在于传递更多信息,内容仅供参考。相关股票、投融资等资讯及分析并不代表本网站赞同其意见和对其真实性负责,不构成投资建议。
若不慎涉及侵权,请在相关内容刊发之日起 30 日内联系我们,我们将第一时间进行删除处理。
转载本网资讯请注明来源作者。本网原创文章、研究报告禁止转发。
Information excerpted or reprinted from third parties on this website is intended to convey more information for reference only. Related stocks, investment and financing news and analysis do not represent the endorsement of this website, nor does this website assume responsibility for their authenticity, and do not constitute investment advice.
If any content unintentionally infringes upon rights, please contact us within 30 days from the date of publication, and we will remove it as soon as possible.
When reprinting content from this website, please indicate the source and author. Original articles and research reports of this website may not be redistributed.
提交留言Submit message留下联系方式,平台将把您的需求推送给匹配的产业方Leave your contact details and we will match you with relevant industry partners.
数据来源与口径说明:本平台数据与资讯均以「唯一官方口径」采集与发布,优先采用国家部委、国家统计局、海关总署、中国氢能联盟、IEA / IRENA / IMO 等官方或政府间机构公开数据;同一指标只取一个来源,不做多源拼接。数值为公开发布值,可能因统计口径、产地与发布时间不同而存在差异,仅供参考,不构成交易依据。Data sources and methodology: all data and news on this platform are collected and published from a single official source, giving priority to public data from government bodies and intergovernmental organisations such as the National Bureau of Statistics, the General Administration of Customs, the China Hydrogen Alliance, and IEA / IRENA / IMO. One indicator has one source only and is never stitched together from multiple sources. Figures are published values and may vary with statistical scope, origin and release date. For reference only; not a basis for transactions.
相关信息Related Information同栏目 · 可直接进入各自最终页Same section · each opens its own final page
- 航天炉"点煤成金":从我国第一台自主粉煤加压气化炉到零碳负碳技术转型2026-10-12
- 18至25元对15元:绿氢成本逼近灰氢那一刻,8%至10%的项目收益是靠什么撑起来的2026-10-11
- 视频|海水制氢,中国突破!2026-10-11
- 陕西研制液氢航空地面保障系统完成全流程一体化测试2026-10-11
- 1121.05兆瓦与1062MW:2026上半年电解槽订单两个口径的差,与份额集中到46%的真相2026-10-11
- 从“气”到“氢”的一字之变 四川资阳打造成渝氢走廊氢源配送中心2026-10-10