黄河几字弯—中原氢能综合应用试点城市群工作在鄂尔多斯启动How many bends does the Yellow River have—Work on the Central Plains Hydrogen Energy Comprehensive Application Pilot City Cluster has launched in Ordos

10月26日,黄河几字弯——中原氢能综合应用试点城市群工作部署会暨方案及政策解读会在鄂尔多斯市召开。会议全面启动城市群试点建设,系统解读国家试点政策和实施方案,标志着黄河几字弯——中原氢能综合应用试点城市群正式进入全面落地实施阶段。
会议规格与参与范围体现了跨区域协同的特点。来自内蒙古、河南、山西、陕西、湖北、宁夏6省区工信部门负责同志,鄂尔多斯、郑州两个主责城市政府分管负责同志,以及12个城市和地区政府及工信部门领导、院士专家、企业代表、高校院所代表等200余人参加会议。
空间布局上,黄河几字弯——中原试点城市群横跨6省区、覆盖12个城市(地区),创新推行鄂尔多斯、郑州双主责工作模式,以绿氢管网和北煤南运氢走廊为双轴联动,构建双核引领、双轴串联、多极联动空间布局。
双主责城市的分工各有侧重。鄂尔多斯依托西部风光资源和能源工业基础,主责工业场景建设,联动榆林、宁东能源化工基地、包头、乌海、锡林郭勒盟、朔州,主攻绿氢规模化制备、氢基化工原料替代、绿色氨醇、掺氢燃烧、氢冶金等工业领域氢能应用;郑州市依托中部交通枢纽和装备制造优势,主责燃料电池汽车推广、氢能创新应用和核心技术装备攻关,联合平顶山、濮阳、太原、荆门等城市,着力构建豫鄂赣、豫晋蒙、豫鲁、豫陕四条氢走廊。
按照《黄河几字弯——中原氢能综合应用试点城市群工作方案》设定,四年试点周期内,城市群将实施28个工业场景项目;推广氢燃料电池汽车2500辆、两轮车46300辆、矿卡10辆、叉车530辆、轨道机车2辆、航空器467架;布局热电联供项目101个、新型储能项目11个,新建加氢站32座。重点落地氢基化工原料替代、绿色氨醇、掺氢燃烧、氢冶金等一批工业示范项目,依托京藏、京港澳、连霍、二广高速主干路网,统筹建设跨区域氢能廊道,试点末期工业场景平均终端用氢价格控制在20元/千克以内,车辆控制在25元/千克以内。
部署会上,鄂尔多斯市作为城市群工作专班办公室介绍城市群总体工作方案。6省区相关部门代表、12个成员城市依次汇报本地试点推进计划、年度任务与项目储备情况。工信部、财政部围绕国家试点任务、绩效目标、中央财政奖励资金规范使用提出明确工作要求。会上审议通过《黄河几字弯——中原氢能综合应用试点城市群协同推进工作机制》《黄河几字弯——中原氢能综合应用试点城市群内部考核评价办法》,明确首年度重点推进工业绿氢示范、氢能交通廊道、装备技术攻关三类标志性项目。
会上,中汽政研围绕国家氢能综合应用试点设立背景、总体考虑、支持政策和管理要求进行了权威解读;鄂尔多斯新能源研究院专家对外发布《黄河几字弯——中原氢能综合应用试点城市群工作方案》,为各成员城市推进试点提供了操作依据。
On October 26, the work deployment meeting and the plan and policy interpretation meeting for the Yellow River's meander — Central Plains Hydrogen Energy Comprehensive Application Pilot City Cluster was held in Ordos City. The meeting fully launched the pilot city cluster construction, systematically interpreted the national pilot policies and implementation plans, marking that the Yellow River's meander — Central Plains Hydrogen Energy Comprehensive Application Pilot City Cluster has officially entered the full implementation stage.
The meeting's scale and the range of participants reflected the characteristics of cross-regional coordination. More than 200 participants attended the meeting, including responsible officials from the industrial and information technology departments of six provinces and regions (Inner Mongolia, Henan, Shanxi, Shaanxi, Hubei, Ningxia), the relevant officials in charge from the two leading cities of Ordos and Zhengzhou, as well as leaders from the governments and industrial and information technology departments of 12 cities and regions, academicians and experts, enterprise representatives, and representatives from universities and research institutes.
In terms of spatial layout, the Yellow River's meander — Central Plains Pilot City Cluster spans six provinces and regions and covers 12 cities (regions). It innovatively implements a dual-leading responsibility working model with Ordos and Zhengzhou, using the green hydrogen pipeline network and the coal-to-hydrogen transport corridor from north to south as dual axes, constructing a spatial layout guided by dual cores, connected by dual axes, and driven by multiple centers.
The division of responsibilities between the two main cities has its own focus. Ordos, relying on the western wind and solar resources and energy industry base, is primarily responsible for the construction of industrial scenarios, coordinating with Yulin, Ningdong Energy and Chemical Base, Baotou, Wuhai, Xilingol League, and Shuozhou, with a main focus on industrial hydrogen energy applications such as large-scale green hydrogen production, hydrogen-based chemical raw material replacement, green ammonia and methanol, hydrogen-blended combustion, and hydrogen metallurgy. Zhengzhou, relying on the central transportation hub and equipment manufacturing advantages, is primarily responsible for the promotion of fuel cell vehicles, innovative hydrogen applications, and research and development of core technological equipment, collaborating with cities such as Pingdingshan, Puyang, Taiyuan, and Jingmen, aiming to build four hydrogen corridors: Henan-Hubei-Jiangxi, Henan-Shanxi-Mongolia, Henan-Shandong, and Henan-Shaanxi.
According to the "Yellow River Several-Bend — Central Plains Hydrogen Energy Comprehensive Application Pilot City Cluster Work Plan," during the four-year pilot period, the city cluster will implement 28 industrial scenario projects; promote 2,500 hydrogen fuel cell vehicles, 46,300 two-wheelers, 10 mining trucks, 530 forklifts, 2 rail locomotives, and 467 aircraft; deploy 101 combined heat and power projects, 11 renewable energy storage projects, and build 32 new hydrogen refueling stations. The focus will be on implementing a series of industrial demonstration projects such as hydrogen-based chemical raw material substitution, green ammonia and methanol, hydrogen-blended combustion, and hydrogen metallurgy. Leveraging the main expressway network of Jingzang, Jinggang’ao, Lianhuo, and Erguang Highways, cross-regional hydrogen corridors will be planned and constructed. By the end of the pilot period, the average terminal hydrogen price for industrial scenarios will be controlled within 20 yuan/kg, and for vehicles within 25 yuan/kg.
At the deployment meeting, Ordos City, acting as the office for the urban agglomeration task team, introduced the overall work plan for the urban agglomeration. Representatives from relevant departments of six provinces and regions, as well as 12 member cities, reported in turn on their local pilot promotion plans, annual tasks, and project reserves. The Ministry of Industry and Information Technology and the Ministry of Finance put forward clear work requirements regarding national pilot tasks, performance targets, and the standardized use of central financial incentive funds. During the meeting, the work mechanisms for collaborative promotion of the Yellow River Bend — Central China Hydrogen Energy Comprehensive Application Pilot Urban Agglomeration and the internal assessment and evaluation methods for the same were reviewed and approved, clarifying that in the first year, the focus will be on promoting three types of landmark projects: industrial green hydrogen demonstrations, hydrogen energy transport corridors, and equipment technology research and development challenges.
At the meeting, the China Automotive Policy Research Institute provided an authoritative interpretation regarding the background, overall considerations, support policies, and management requirements for establishing the national hydrogen energy comprehensive application pilot. Experts from the Ordos New Energy Research Institute publicly released the 'Work Plan for the Yellow River Bend — Central China Hydrogen Energy Comprehensive Application Pilot Urban Agglomeration,' providing operational guidance for member cities to advance the pilot.
[Source: Compiled from China Energy Network and Ordos City Media Center]
[Editor: Xiao Neng]
本网站摘录或转载的属于第三方的信息,目的在于传递更多信息,内容仅供参考。相关股票、投融资等资讯及分析并不代表本网站赞同其意见和对其真实性负责,不构成投资建议。
若不慎涉及侵权,请在相关内容刊发之日起 30 日内联系我们,我们将第一时间进行删除处理。
转载本网资讯请注明来源作者。本网原创文章、研究报告禁止转发。
Information excerpted or reprinted from third parties on this website is intended to convey more information for reference only. Related stocks, investment and financing news and analysis do not represent the endorsement of this website, nor does this website assume responsibility for their authenticity, and do not constitute investment advice.
If any content unintentionally infringes upon rights, please contact us within 30 days from the date of publication, and we will remove it as soon as possible.
When reprinting content from this website, please indicate the source and author. Original articles and research reports of this website may not be redistributed.
提交留言Submit message留下联系方式,平台将把您的需求推送给匹配的产业方Leave your contact details and we will match you with relevant industry partners.
数据来源与口径说明:本平台数据与资讯均以「唯一官方口径」采集与发布,优先采用国家部委、国家统计局、海关总署、中国氢能联盟、IEA / IRENA / IMO 等官方或政府间机构公开数据;同一指标只取一个来源,不做多源拼接。数值为公开发布值,可能因统计口径、产地与发布时间不同而存在差异,仅供参考,不构成交易依据。Data sources and methodology: all data and news on this platform are collected and published from a single official source, giving priority to public data from government bodies and intergovernmental organisations such as the National Bureau of Statistics, the General Administration of Customs, the China Hydrogen Alliance, and IEA / IRENA / IMO. One indicator has one source only and is never stitched together from multiple sources. Figures are published values and may vary with statistical scope, origin and release date. For reference only; not a basis for transactions.
相关信息Related Information同栏目 · 可直接进入各自最终页Same section · each opens its own final page
- 河南三城入选国家氢能试点2026-10-12
- 河南三城“氢”装上阵 郑州、鄂尔多斯建立“双主责”协同机制2026-10-12
- 多用户绿电直连项目申报启动!石家庄钢铁、石化、零碳园区等迎来绿电利用新机遇2026-10-11
- 我国氢能产业进入发展快车道2026-10-11
- 工信部《工业绿色低碳发展“十五五”规划》:2030年工业碳达峰与500个零碳工厂2026-10-10
- 内蒙古唯一、全国3个全链条试点之一 包头氢能产业向新向优2026-10-09